Governance

A deterministic model for assurance position

PACT is designed to make assurance more consistent, more explainable, and easier to review over time. Instead of relying on subjective RAG reporting, it uses structured signals, explicit logic, and immutable snapshots.

Structured signalsDeterministic postureExplicit capsImmutable snapshotsDrift detection

Why this model exists

Reduce ambiguity without flattening governance into opinion

Traditional governance reporting often depends on interpretation, presentation style, and confidence in the room. PACT takes a more explicit approach so the basis for a position is clearer before the discussion starts.

What changes
Signals are structured rather than purely narrative
Logic is explicit rather than implied
Snapshots preserve the position over time
Drift becomes visible instead of anecdotal
Explicit inputs

PACT uses structured signals rather than open-ended status writing. That reduces interpretation drift and makes governance inputs more comparable across projects.

Deterministic translation

Signals are assessed through explicit rules, stage-aware logic, and posture caps. The same inputs produce the same result.

Traceable outputs

Governance positions can be traced back to the signals, evidence, and logic behind them when a result needs to be challenged or reviewed.

PACT principle

If a stakeholder challenges a result, the answer should not depend on who wrote the status update. It should be possible to point to the signals, evidence, and logic that produced the position.

Core mechanics

The mechanics behind the model

These mechanics are what make PACT consistent and reviewable in practice. They change how a governance position is formed, recorded, and reviewed over time.

Stage-aware signals

Signals change by lifecycle stage because the evidence needed in Concept is not the same as the evidence needed in Release or Operate.

  • Concept, Design, Build, Release, Operate
  • Different evidence expectations by stage
  • Consistent governance structure across the lifecycle
Posture and caps

PACT uses a structured posture model with explicit caps where critical concerns should limit progression or confidence.

  • Strong / Moderate / Partial / Minimal
  • Caps surface blocking concerns clearly
  • Helps make continuation decisions more explicit
Immutable snapshots

Each governance cycle can be preserved as a point-in-time record so teams can review what was known, what changed, and what decisions followed.

  • Time-stamped audit history
  • Snapshot comparison over time
  • Supports governance traceability
Drift as a signal

PACT treats deterioration, stale reporting, and unresolved concerns as governance signals rather than waiting for them to emerge informally.

  • Snapshot-to-snapshot comparison
  • Emerging concerns surfaced earlier
  • Supports a steadier review cadence

Lifecycle fit

Stage-aware by design

PACT uses one governance model across the lifecycle, while adjusting the signals and evidence expected at each stage of delivery.

Concept

Early viability, intent, sponsorship, and scope clarity.

Design

Solution readiness, planning confidence, dependencies, and design control.

Build

Delivery confidence, implementation control, quality readiness, and execution stability.

Release

Cutover discipline, operational preparedness, and residual risk handling.

Operate

Service stability, follow-through, controls, and ongoing governance rhythm.

PACT is intended to complement established delivery and governance approaches, including waterfall, agile, hybrid, PMI, and PRINCE2-style environments, without prescribing one operating method.

Want to see the model in the product?
Start with the core features, then progress into real projects.
Explore product →